Four short links: 15 2020 may


  1. Most love the efficiency of the development of the skills In the one project or does not complete the task, make note of what the next thing is you want to work. This allows you to bypass the 10 minute direction to get back to the project the next time you pick it up. I don’t hear it called that before. All the suggestions are very good.
  2. VR-DOS An experimental”computer running on DOS”emulator inside a virtual reality environment.
  3. Network component of the COBOL-pong—stupid flex week: The ping-pong write the COBOL coding WebAssembly.
  4. Expanded engineering team from 0 to no real fault of the different ways the project team’s needs and structure change as the company grows.



Spread the love
Do NOT follow this link or you will be banned from the site!